FLNG-1
SUMMARY
Our proprietary Fast LNG design is an offshore natural gas liquefaction facility built on platforms. It all starts at the shipyard, where we build our standardized, modular liquefaction units.
This offshore operation gives us unique access to stranded gas and gas that might otherwise be flared, with clear environmental benefits. We process the gas through the treatment module, then liquefy it through the liquefaction module.
The LNG is transferred from the facility to a floating storage unit (FSU) – which is cheaper, faster, safer, and better for the environment than land-based storage. When it’s ready for shipment, the LNG is transferred from the FSU to an LNG tanker, then carried to markets around the world!
FEATURES
Location
Off the coast of Altamira, Tamaulipas, Mexico
Client
New Fortress Energy
Total Project Manhours
9,000,000
Safety Stats
2 recordables, zero lost time
Quantities of material installed
- Piping: 162,987 LF
- Steel: 3704 TONS
- Equipment: 202 Pieces, 9,391,479 Pounds
- Flange Make UP’s 946